Manage

At North Group, we understand that each project requires an individual solution and a collaborative attitude. From concept to completion, North Group’s experienced management team will take full care of your project, conscientiously planning and managing its entirety.

With each project, regardless of scale, our clients are provided with a dedicated project manager who is on hand to oversee every aspect of the construction process, and provide a seamless customer experience. Sporting a wealth of industry knowledge and hands-on experience, our project managers ensure each project is on time and to budget, whilst ensuring full compliance with regulations.

Built on a foundation of trust and exceptional delivery, our collaborative approach is demonstrated in our expanding client base who repeatedly return to North Group for their construction and refurbishment requirements.

  • Client

    The Grande

    Project

    Demountable Partition and Washroom Packages within The Grande

  • Client

    Space Solutions

    Project

    iQ Building Fit Out

  • Client

    Sir Robert McAlpine

    Project

    Various Joinery Packages

  • Client

    The Ship Inn

    Project

    Refurbishment of bar and lounge

  • Client

    Offshore Simulator Training Facility

    Project

    Helicoper Simulator Facility Refurbishment

  • Client

    Total French School

    Project

    Alterations and Refurbishment of the Total French School

  • Client

    Maersk Janice Platform

    Project

    Mess Room Refurbishment

  • Client

    Talisman Clyde Platform

    Project

    Galley Refurbishment

Client: The Grande

Project: Demountable Partition and Washroom Packages within The Grande

Location: Aberdeen

North Group was tasked with the installation of the Venesta washroom systems to all male and female washrooms on all eight levels, as well as the installation of the male and female shower rooms on the ground floor.

As well as the washroom systems, we were also involved with the installation of demountable partitions within the eight storey office block. These partitions comprised of metal stud and plasterboard, pre finished oak veneered door sets and over panels with an element of single and double glazing partitions, acoustic barriers above ceilings and below floors.

Client: Space Solutions

Project: iQ Building Fit Out

Location: Justice Mill Lane, Aberdeen

North Group were appointed contractor for the 1st floor office fit out of the IQ Building.

As part of the work involved in this Grade A office accommodation in a prime city centre location, we installed suspended ceilings, partitions – both plasterboard and glazed, walnut door sets and feature walnut walls, kitchen, teapoints, toilets and shower rooms.

North are delighted to be associated with such a prestigious development.

Client: Sir Robert McAlpine

Project: Various Joinery Packages

Location: Prime Four, Kingswells, Aberdeen

We were delighted to be awarded the joinery and dry lining packages for Plot 1 and the washroom and FF&E packages for Plots 1 - 4 at the new Prime Four Business Park in Kingswells, Aberdeen.

Three major operators in the energy industry have now taken residence in the state of the art office complexes and global training facilities, in what is being considered a world class business park.

North Group are very proud to be part of such a prestigious development, which includes the provision of in excess of 200 door sets, timber stair handrails, internal wall panels and partitions, suspended ceilings, toilet cubicles and vanity units, changing room lockers and benches and over 5km of skirting and picture rails.

Client: The Ship Inn

Project: Refurbishment of bar and lounge

Location: Stonehaven, Aberdeenshire

North Group completed the comprehensive refurbishment of the bar and lounge areas of the Ship Inn, Stonehaven, and we were delighted to showcase our specialist design and joinery manufacturing services in such a prestigious establishment.

The scope of works included the construction of a new extension to the rear of the building, providing new toilet and staff room facilities, the manufacture of a bespoke bar and gantry, as well as general refurbishment works.

Client: Offshore Simulator Training Facility

Project: Helicoper Simulator Facility Refurbishment

Location: Aberdeen

North Group were appointed as main contractor for refurbishment works at both the existing and new helicopter simulator building in Dyce.

Within the old building North refurbished the existing offices, briefing rooms, classrooms and toilets. This included the supply and fitting of new doors, suspended ceilings and carpets as well as general decoration and electrical works. Following on from this we were asked to make improvements to the entrance and reception areas. As part of the work, new entrance screens were fitted and a reception desk manufactured and installed.

At the new simulator facility we were contracted to erect new office facilities within the building. This comprised erecting stud partitions and a timber framed roof over the office partitions, manufacturing, supplying and fitting doorsets for both office doors and fire doors, general decoration, flooring and electrical works and the design, supply and installation of an air conditioning system.

Client: Total French School

Project: Alterations and Refurbishment of the Total French School

Location: Aberdeen

We were recently involved with the complete refurbishment of the entire Total French School in Aberdeen.

As part of this refurbishment we carried out the following:

  • Complete overhaul of both girls and boys toilets
  • Forming an opening in an existing granite wall to install a set of moving doors
  • A large asbestos removal package
  • Rewiring of the heating and air con works
  • New data cabling
  • Decoration
  • New floor coverings
  • Installation of new playground equipment and security fencing
  • Installation of a new stand-alone canopy

We completed the works, which involved ourselves and 15 separate sub-contractors, within the eight week time period.

Client: Maersk Janice Platform

Project: Mess Room Refurbishment

Location: Offshore

North Group recently completed the refurbishment of the mess hall on the Maersk Janice Platform for ESS. The works included decoration, flooring and the installation of new acoustic partitions. Existing walls and ceilings were painted, the flooring was replaced with Amtico Wild Walnut wood strip planking in front of the new counters and central island, Fordo Tessera heavy duty carpet tiles in the seating area and Polyflor non-slip vinyl behind the service counters. Using acoustic partitions we created a new enclosed storage area behind the service counters and all the catering equipment was replaced.

Client: Talisman Clyde Platform

Project: Galley Refurbishment

Location: Offshore

North Group was awarded this contract for the complete refurbishment of platform galley and associated freezers, fridges and dry store areas. Scope of works for this project included the installation of new ceilings, light fittings, Altro wall panelling and heavy duty floor tiles.

What our clients think

I would like to thank North for their excellent performance on the Scott Sutherland refurbishment…

Project Manager,
Robert Gordon University

The job completed by North was excellent. The workmen on site were great, keeping me in the loop…

Facilities Manager,
CNR International (UK) Ltd

Another excellent job done by North Offshore and most importantly completed without accident or…

Offshore Installation Manager,
Kittiwake Platform